Bottle, can and cap coding
Confirm the exact code, substrate, production conditions and acceptance method before equipment selection.
Industry solution planning
Select coding and inspection around wet-line conditions, container material, production speed and the required code location.

Common identification tasks
Confirm the exact code, substrate, production conditions and acceptance method before equipment selection.
Confirm the exact code, substrate, production conditions and acceptance method before equipment selection.
Confirm the exact code, substrate, production conditions and acceptance method before equipment selection.
Confirm the exact code, substrate, production conditions and acceptance method before equipment selection.
Engineering inputs
The same package can require a different technology when the material, code size, speed, environment or inspection task changes.
Scalable system scope
Laser, inkjet, thermal transfer or labeling with the required trigger, mounting, handling and safety provisions.
Add lighting, camera inspection, code rules, alarms or rejection and defined result storage.
Add serialization, aggregation, line control and scoped ERP, MES or WMS interfaces only where required.
Related application
This link describes a representative application concept, not a performance claim or named-customer result.
Review the beverage-label CO₂ laser and vision applicationFrequently asked questions
No single technology fits an entire industry. Selection depends on the exact material, code, required permanence, speed, environment, handling and inspection criteria.
A defined camera task can check presence, position, OCR or OCV, barcode or DataMatrix quality, with alarm, rejection and result records where the line supports them.
Provide representative samples, code artwork or data, target speed, product handling, environment, inspection acceptance and required interfaces.
Engineering next step
Share the product, material, code, line speed, environment and verification requirement. VORANIX will prepare provisional options for engineering review.